Sunday 28 April 2019

The Wall Part 1

The rock wall is in place and has a bit of greenery added. Overall, I think that the alfoil mould experiment worked well. I have ordered some casting plaster and bought some super strong foil for next time.


I also a started building a retaining wall. This was done with Scalescenes retaining wall kit. The kit was not built as per the instructions but made in such a way that it fits in the space available. If you've not seen Scalecenes before click here. You buy their kit and run it off as many times as you need to.

Everything finishes flush with the top of the above baseboard. The concrete for the oil depot will sit on top.

The retaining was was needed as the next section was a bridge.


More Scalescenes retaining wall was printed off. 

The brick wall is glued onto matte board used by people framing artworks or photos. I have some offcuts kicking about. The plinths at the bottom are glued onto double thickness cardboard. The columns are glued onto thin card and then glued on after the plinths have been added. At all stages of construction effort was made to wrap the paper around the cardboard.

The bridge was completed with some girder shaped Evergreen styrene strip painted grey. The inspiration came from the flyover at the western end of Strathfield station. I'll need to add some more to stick underneath the top baseboard to hide the empty cavern.

The aim of this was to complete this bit before finishing off the oil depot on the top.


Now I have started this bit. I have cut the packing cardboard from an old corrugated cardboard box. This had a bulk order of cat food in it. The large section near the camera will be the last bit to be glued down. I'm going to use Scalescenes concrete to complete the oil depot. This came as part of a dockside kit which I bought years ago. The gaps between the tracks will be glued onto cardboard and then glued onto the the packing cardboard. The large section will have the paper wrapped around the visible edge to tidy it up. In between the rails, the concrete paper will be glued to cardboard and then glued onto the sleepers.

Jobs for this week:
1. Apply static grass between the run around track and the first oil depot siding.
2. Finish off the packing pieces of cardboard. (I only have two bit to go and they are straight.)
3. Cut out the top bits of card and print sheets of concrete paper.
4. Glue it together.
5. Ballast track.
6. Glue more static grass (not on the same day or the grass sticks to the ballast.)
7. Put up fence.
8. Repair oil loading platform.

I'm hoping to get the top four done at least.

Until next time.



No comments:

Post a Comment