Saturday 16 November 2019

North Eastern Corner Part 3

The baseboard was painted and the track ballasted.

After that the gap between the polystyrene and the baseboard was covered up with lichen and foam. A bit like a skirting board.

Two different shades of ballast were used. I think that they are both different shades of Bombo Ballast from Matt's Ballast. The finer, dirtier ballast was used for the siding. The cleaner stuff was used for the mainline. It's slightly coarser which would suit for a well maintained line.

The bare board in the foreground will be part of a goods yard and will be fenced off, and the board covered in a light layer of plaster and painted to represent dirt or perhaps tarmac.

The scenic skirting board travelled most of the length of the new landform.


It occurred to me that the the greenery around the ballast loader might be covered in some spillage. I scraped away the vegetation that I had just put down and had another go.


After looking at some embankment lately, I noticed that a lot of them have a whole heap of things growing on them.


I popped into my local hobby shop and picked up a couple of packs of the Woodlands Scenic Fine Foliage. They're sometimes also referred to as tree armatures.Holes were poked into some of the plaster, the armatures dipped into glue and then planted.

I though that buying a couple of boxes would last me for a few years but some of the armatures are pretty much trees in their own rights. See the image below.


It's also a touch of before and after between the first and last photos.

What is next? Here is the old list from last weekend list with amendments.

1. Glue the polystyrene together. Completed.
2. Coat it with plaster.  Completed.
3. Paint it.  Completed.
4. Sort out fences - paint them too. In progress. - fences on order.
5. Create back yards. In progress. 
6. Glaze and light houses. 
7. Add static grass and trees to landform. In progress. One yard to go.
8. Create platform for loading dock. In progress. Needs tarmac top.
9. Place on the layout. 
10. Ballast the siding and the mainline. In progress. Track behind the brewery is still yet to be done.
11. Build the new building for the conveyer to run from.
12. Plaster Goods Yard.
13. Ballast Points near the station.
14. Build signal box for the station.
15. A fence, or hedge to the station.
16. Build grain unloading facility for brewery.
17. Finish brewery.
18. Finish industry next to brewery.
19. Build warehouse backs for back scene between Brewery Lane Station and houses.
20. Retaining wall in front of brewery and the next door industry.
21. Finish off static grass and scenic touch ups.

I reckon that the brewery might get a look in this week.

Until next time.